Showing posts with label WIP. Show all posts
Showing posts with label WIP. Show all posts

Monday, January 5, 2015

Gypsy Wife QAL - December

It's the final month of the Gypsy Wife quilt along hosted by Michelle at Factotum of Arts.  December's task was to assemble the top.  I think we all underestimated how much time it would take.  I think I spent somewhere between 12-16 hours on it.  Maybe I'm just slow?

But here she is.

I'm not in love with the blue and purple strip on the left, but my laziness is winning so far.  Too much work to swap it for another.

I'm so glad I participated in this quilt along!

Saturday, December 6, 2014

Gypsy Wife QAL - November Blocks

It's been a month again.  This fall the kids had viruses, a sinus infection, I had a sinus infection, then a crazy Thanksgiving with a power outage, etc.  I lost my sewing mojo a bit. 

But, I've found it again, and I managed to finish up my Gypsy Wife blocks on November 30.  Then I had to wait until this weekend to photograph them with some actual sunlight! 

Here they are, the last of the blocks for the Gypsy Wife quilt. 



I love these half square triangle blocks.  I made the first one and then had the wild idea to rainbowtize the second one.  I love it even more.  




December is all about strips and assembling.  That is going to have to wait until after Christmas for me, but hopefully by New Years Eve I'll be rocking out a quilt top!

Linking up this month at No Hats!

Tuesday, October 28, 2014

Gypsy Wife QAL - October Blocks

We're almost done!!!  Just a few more blocks (and a bunch of strips) to go in the Gypsy Wife Quilt-Along.  The October blocks were a bit challenging from a fabric selection standpoint.  I'm trying to use different combos but make sure the colors are spread out evenly.

Here are the "big" blocks.
Nurses Cross - not perfect in the center but I still like it.
Old Maid's Puzzle (I made the half square triangle blocks and then realized those are for next month so had to go back and do these).
And the filler blocks.
Next month are the last few blocks, and then it's assembly time.  It's always nice to have this QAL as a break from other projects each month.  It's the first QAL I've actually done along with everyone (not finding it after the fact), and I've enjoyed it so much that I'm already trying to figure out quilt-alongs for next year. 

Linking up with the QAL at iamacraftykat!

Friday, September 12, 2014

Fancy Fox Quilt Top

A couple weeks ago I rewarded myself for finishing a project (I can't even remember what it was) by letting myself make one Fancy Fox block.  I bought the pattern by Elizabeth Hartman back when it first came out, and it had been patiently waiting . . . well, one block wasn't enough.

I may or may not have become a bit obsessed.
42 foxes were sewn in a week.

And the top was completed by the end of week two.

That's some kind of record for me.

Now I have to piece the back, and then it joins the pile of quilts to be quilted . . . if I ever get my new sewing machine table built. 

 Linking up to Finish It Up Friday at Crazy Mom Quilts!

Wednesday, May 28, 2014

Gypsy Wife QAL - May Blocks

It's another month of the Gypsy Wife Quilt Along!  I was busy this month and just finished the filler blocks this week.

This month was Hope from Hartford - I did this one a while ago, and it's about the best inset seams I've done.  (I'm working on a lonestar quilt with the #bucketlistqal on instagram, and those inset seams are not playing as nicely).

Then there were the filler blocks, some square within a square - I did better with contrast on these.



And some hourglass blocks.  The green one (hourglass + square within a square) was a total pain.  The pattern says cut a 3 3/4" square, cut into four triangles, but it really is a 4 3/4" square.  I figured that out on the third try.  Grrr.  I hate ripping and redoing and usually figure it adds to the charm of the quilt, but that one was not possible to leave.  I'm just glad it's done.



I've been trying to finish up a few things that were left undone before our Nebraska trip, and I'm getting there slowly but surely. 

Linking up to WIP Wednesday at Freshly Pieced and our Gypsy Wife monthly linkup!


Wednesday, April 30, 2014

Gypsy Wife QAL – April Blocks



It’s another month of the Gypsy Wife quilt-along!  I finished up my April blocks a couple weeks ago.  I’m starting to get really excited for this quilt!  

Here are the April blocks.  

From the Heart

Courthouse Steps – 8” 

Courthouse Steps – 7” (I think I’m going to change the outer border – it’s just not right)

More Courthouse Steps – can I tell you how much I LOVE the orange/pink/gray one?!

And one Square in a Square block.  It’s fine, but I need to use better fabrics in these blocks in the future.  It’s too blendy or something.  I need definition!

It’s giving me great pleasure to highlight each block on clumsy kristel's Excel cheat sheet as I finish it!

There are enough blocks after three months that I decided to put them on my design wall in their respective spots.  It’s not an exact layout, but close enough.  I figure this will help me balance my color combos a little better.  And it makes me happy.  I may have to figure out which blocks I need to finish so I can get a section sewn up.  I may not make it to December without finishing this quilt!  But, I am loving the relaxed pace of this QAL.  It’s low stress, and that is a good thing for me.  Helps me not worry about twaddling along on a quilt (usually the QALs move at lightning speed and I’m all “I’ve made three blocks!”).    

I'm linking up to our monthly QAL party at Jaffa Quilts!

Wednesday, March 19, 2014

WIP Wednesday - Strep Throat Edition

I’ve been a bum lately.  Last week I was just off my sewing mojo, and then Sunday I came down with strep throat.  Let me tell you, strep throat as an adult stinks!  I’m on day 4, and things are getting better, but man is my throat raw and sore.  It is a beauty when you look in there with a flashlight.  And my husband tells me I’ve been snoring. 

It’s been quite a ride the last three months in my house with various illnesses.  We’ve had the perfect storm for incubating all the germs.  My parents living with us after their chimney fire exposed us to all the germs they bring home from their jobs, the kids going to a new daycare for two months exposed us to all those lovely bugs, and I’ve brought stuff home from my work – plus the weather hasn’t been conducive to people staying healthy this year.  It’s been a hard winter both weather and illness-wise.  Hopefully we’ll turn the corner soon.
Anyways, where was I?  Oh yes, not much to show the last couple weeks, what with me being a sewing bum.  It happens.  I have done a little more chain piecing on my Burgoyne Surrounded / APQ Quilt-Along blocks.  I have nine center sections done and lots of other parts sitting around in various stages.  Truthfully, I’ve only worked on it in sneaky 15 minute increments here and there in the mornings.  But at least it’s progress (no matter how slow) and not sitting in a box like my other UFOs.

I bought the Small Fry Skinny Jeans pattern from Titchy Threads and got all the pieces cut out for both kids.  Material is selected, threads and most of the notions purchased (the notions about put me in the nuthouse poorhouse – jeans rivets and snaps are expensive!).  I still need to order a roll of buttonhole elastic, and then I think I’ll be set to try my first pair sometime soon.  If I don’t get to them before April, they’ll have to sit awhile – Easter outfits will take precedence then. 

The Farmer’s Wife quilt hasn’t made much progress this week, but we’ll talk about it on Friday. 

Here's a little #honestcraftroom for you.  This needs to get cleaned up big time before the end of the month.
If I can get this strep gone for good and get my mojo back, I’m mentally primed and ready to go full throttle. 

Friday, February 28, 2014

Farmer's Wife Friday - 2.28.14

Welcome to a new feature on my blog.  I’ve decided I will post my updates on the Farmer’s Wife quilt each Friday until it’s finished.  Here is the quilted portion:


And some stats:

Bobbins Used in Quilting: I wound 10 to start with, and I'm on #8
Hours of Quilting: around 15 so far (should be pretty close)
Blocks Quilted: 30
Blocks to Go: 98 (plus the border)

Things I have learned so far:
  • Don’t test the Juki.  She will win.  I’m not sure how this happened, but she sewed right through a basting pin, no problem. 
  • I’m not sure my Juki likes FMQ directly sideways.  Any sort of angle to a line helps.  And probably improved hand/foot speed coordination as well.
  • I agree with Leah Day that I need to alter my FMQ foot.  I can’t freaking SEE with the metal across the front.  Must fix that before I do another quilt.  On the other hand, my foot doesn’t really hop that much, so that’s not an issue for me.
  • I need a tiny light for the back side/under the arm of my machine.  The light in front is crazy good but then there’s a black hole behind.
  • Stitch in the ditch is killing me with my FMQ foot.  Alas, the tiny pieces in the blocks render it way too difficult to use my walking foot, not to mention I’d have to swap out feet like 20 times in each block.  The positive, I’m sure to get better by the end of this project!
  • My mantra: Leah Day’s advice that washing and drying the quilt will cure 90% of quilting mistakes.  I’m not sure I’d have two blocks finished if I picked out each mistake I’ve made.  “Ain’t nobody got time fo dat!"
And some of my favorite blocks so far, although they’ll be even prettier once it’s finished and laundered.




The quilting is definitely not perfect, but I’m happy. 

Wednesday, February 12, 2014

WIP Wednesday



Since the Olympics started, I’ve been making a concerted effort to stay upstairs and watch the evening coverage rather than lurking in my basement sewing cave.  However, not sewing for a couple weeks isn’t an option if I want to keep my sanity.  So I pulled out the box with my clamshell quilt and have been working on it while we watch skiing, figure skating, and the like. 

The baby is in bed – because he is not a happy camper after 7:30.

My four-year old is full of questions – Who do we like (cheer for)?  :Answer:  Why are they doing X?  :Answer:  Why?  :Answer:  Why?  :Answer:  Why?  (You get the picture.) 

My husband dozes on and off in the arm chair (he’s worked a full day and then helped feed the cattle and sheep after work). 

And I, I stitch. 

I measured the other evening, and my quilt was 54” wide by 45” long.  To keep it the same proportions as a 60”x72” throw quilt, I am going to make it 65” long.  I then measured my clamshells and figured out each row adds 2” to the length (Are you kidding me?  That’s it?  Why didn’t I know this ahead of time?)

The good news: it’s just 10 more rows. 
The bad news:  it’s 10 more rows.  And I may need to make a few more clamshells - my box is running low on variety.

Since I measured, I’ve added one row and just last night pinned and got started on a second row.  So I have 8.5 rows to go.  We’ll see how far I get after the closing ceremony.

One of my “goals” for the year is to focus on one UFO a month.  Maybe not finishing them, but making a focused effort to work on them.  I hadn’t intended for February to be clamshells, but I guess it counts.  I’m hoping this one will be done for the Christmas season this year.  It’s only been four years . . .

LinkWithin

Related Posts Plugin for WordPress, Blogger...